Pour (and roll) technique
POWERDECK F/POWERDECK FA, EUROTHANE Bi-3/Bi-3A on wood support structure – roofing membrane partially bonded using hot bitumen

ROOF SYSTEM DESCRIPTION
1. Wooden bearing structure.
2. Partition layer and vapour control layer. With a wooden bearing construction the partition layer out of rough glass fibre or polyester is installed firstly. Then the underlying layer (reinforced bitumen with polyester) is nailed. The vapour control layer is then torched on or bonded to that layer. If the bearing surface is plate formed, the vapour control layer can be bonded onto this, with the exception of the seams / overlaps where a loose strip will be provided.
3. Thermal insulation boards POWERDECK F/POWERDECK FA, EUROTHANE Bi3/Bi3A, size 1200 mm x 600 mm, preferably mechanically fixed with a minimum of 4 screws per board. Exact number of screws required is calculated on the basis of the wind-load. Screws in insulation panel corners are set in a zone of 100 mm x 250 mm from the edge of every panel, the 250 mm length being measured along the length of the board. The screws and washers will meet the demands of EUtgb class II. The washers have to be compatible with the screws used.
4. Perforated bituminized glass fibres, 15% perforations.
5. Adhesive layer: bitumen 110/30.
6. Waterproofing : single- (or multi-) layer bituminous membrane, (EPDM, …).