Fastening with plastic plugs

1. EUROTHANE
2. Plastic nail
3. Vapour-tight tape
4. Edging strip
5. Anti-dust coating
6. Reinforcement
7. PE foil
8. Concrete floor
9. Foundation
10. "W"-shaped frame
11. PE foil (min. 70 mm thick)
12 Eurothane
![]() |
IMPLEMENTATION The EUROTHANE boards are attached to the wall with plastic plugs (e.g. Hilti - IDP). Care must be paid that the wall insulation forms a good join with the ceiling and floor insulation. In storage areas with low temperatures (lower than 4°C) we recommend positioning a continuous PE foil against the wall first (7). Any overlaps must be a minimum of 20 cm. |